Pacific energy ALDERLEA T4 LE Operating And Installation Instructions page 24

Table of Contents

Advertisement

Begin firebrick installation with the rear wall.
1. Stand one "A" firebrick vertically behind the tab located on the brick rail. Slide the firebrick toward the
center of the rear wall (Figure 13). Slide a 2nd "A" firebrick underneath the tab on the brick rail (Figure 13).
Repeat steps 1 & 2 for the placement of the other "A" firebricks on the rear wall (Figure 13).
2. For the side walls: Stand an "A" firebrick against the side wall and up against the rear wall firebrick. Stand
another "A" brick beside the first one followed by a narrow "B" firebrick (Figure 14).
Figure 13: Remaining rear wall firebricks in place.
3. Place a "D" firebrick on top of the previously placed "A" firebricks and slide this firebrick back toward the
rear wall making sure that this firebrick tucks in behind the brick rail (Figure 15).
4. Slide an "E" firebrick under the side wall brick rail tab and rest on top of the three previously placed side
wall firebricks (Figure 16). Repeat steps 2-4 on the other side (Figure 16).
Figure 15: Small side wall firebrick in position.
100003978
Figure 14: Lower side wall firebricks in place.
Figure 16: Final side wall firebrick in position.
24
ALT 4-LE 040523-28

Advertisement

Table of Contents
loading

This manual is also suitable for:

Alderlea t4 le classic

Table of Contents