Progress Solar/Wind SLT 700 Series Operator's Manual page 106

Light tower
Table of Contents

Advertisement

Switches 4, 5, & 6: Battery Charging Settings
It is important to select the battery type that matches the system battery to ensure proper charging
and long battery life. Refer to the specifications provided by the battery manufacturer and choose a
setting that best fits the recommended charging profile.
Settings
Battery
Switches
Type
4 - 5 - 6
off-off-off
1 - Gel
off-off-on
2 - Sealed
1
off-on-off
3 - Sealed
1
off-on-on
4 - AGM/Flooded
on-off-off
5 - Flooded
on-off-on
6 - Flooded
on-on-off
7 - L-16
on-on-on
8 - Custom
1
"Sealed" battery type includes gel and AGM batteries
All settings are for 12 Volt nominal systems. Multiply the charge voltage settings by 2 for 24 Volt sys-
tems or by 4 for 48 Volt systems. A description of each setting is provided below. See section 4.3 for
full details on battery charging and a description of each of the settings in the battery charging table.
Battery Type - The most common battery type associated with the specified charging settings.
Absorption Stage - This stage limits input current so that the Absorption voltage is maintained. As the
battery becomes more charged, the charging current continues to taper down until the battery is fully
charged.
Float Stage - When the battery is fully charged, the charging voltage will be reduced to the Float volt-
age setting.
Equalize Stage - During an equalization cycle, the charging voltage will be held constant at the speci-
fied voltage setting.
Equalize Interval - The number of days between equalization charges when the controller is config-
ured for automatic equalizations (settings switch 7).
Switch 7: Battery Equalization
Choose between manual and automatic battery equalization charging. In the manual equalization
setting, an equalization will only occur when manually started with the push-button or when requested
from the equalize menu on the TriStar meter. Automatic equalization will occur according to the bat-
tery program specified by settings switches 4, 5, & 6 in the previous step.
22
Absorp.
Float
Equalize
Equalize
Stage
Stage
Stage
Interval
(Volts)
(Volts)
(Volts)
(Days)
14.00
13.70
14.15
13.70
14.40
28
14.30
13.70
14.60
28
14.40
13.70
15.10
28
14.60
13.50
15.30
28
14.70
13.50
15.40
28
15.40
13.40
16.00
14
Custom
Custom
Custom
Custom
Installation
In both settings (auto and manual), the push-button can be used to start and stop battery equaliza-
tion. If the selected battery charging setting does not have an equalization stage an equalization will
never occur, even if requested manually.
Equalize
automatic
Switch 8: Ethernet Security
The Ethernet Security switch enables or disables configuration of the TriStar MPPT 150V set-
tings through the Ethernet connection. When switch eight is set to disabled, write commands to the
TriStar MPPT 150V custom memory are not allowed. This a safety feature to prevent unintended
changes to custom settings, but it is not a replacement for proper network security.
Configuration via TCP/IP
disabled
enabled
NOTE:
Adjustment of network settings and custom set-points is always enabled via the
RS-232 and EIA-485 connections. The Ethernet Security switch only enables/
disables remote configuration via TCP/IP.
CAUTION: Risk of Tampering
!
The Ethernet Security settings switch does not block write commands to devices
bridged via EIA-485.
REMARQUE :
Le réglage des paramètres de réseau et des points de consignes personnalisés
est toujours activé par les connexions RS-232 et EIA-485. Le contacteur de
sécurité Ethernet n'active/désactive que la configuration à distance par TCP/IP.
PRUDENCE : Risque de tentative d'altération
!
Le contacteur des paramètres de sécurité Ethernet ne bloque pas les
commandes d'écriture sur les dispositifs reliés par EIA-485.
TriStar MPPT Operator's Manual
Switch 7
manual
OFF
ON
Switch 8
OFF
ON
23

Advertisement

Chapters

Table of Contents
loading

Related Products for Progress Solar/Wind SLT 700 Series

Table of Contents