Mars Comfort-Aire Century VCD-SA Series Service Manual page 186

Hide thumbs Also See for Comfort-Aire Century VCD-SA Series:
Table of Contents

Advertisement

Procedure
5) Pull out the wire connected with the
terminal. (see CJ_ODU_PCB_004-4 ).
6) Pull out connectors of the condenser
coil temp. sensor(T3),outdoor ambient
temp. sensor(T4) and discharge temp.
sensor(TP) (see CJ_ODU_PCB_004-4 ).
7) Disconnect the electronic expansion
valve wire (see Fig CJ_ODU_PCB_004-
4 ).
8) Remove the connector for 4-way valve.
(see Fig CJ_ODU_PCB_004-4 ).
9) Remove the connector for the reactor
(see Fig CJ_ODU_PCB_004-4 ).
10) Then remove the electronic control box
(see Fig CJ_ODU_PCB_004-4 ).
Note: This section is for reference only. Actual unit appearance may vary.
Illustration
T3/T4
TP
Terminal
Outdoor Unit Disassembly 17
Service Manual - VCDxxSA
CJ_ODU_PCB_004-4
4-Way Valve
Reactor

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents