Maintenance And Service; Maintenance Of The Machine - Norton Clipper CS 401 P13 Operating Instructions Manual

Table of Contents

Advertisement

VERS.2015.07.21

MAINTENANCE AND SERVICE

6
CAUTION: to perform maintenance of the machine, always switch it off. Always wear a mask
and safety goggles while performing the maintenance of machine.

6.1 Maintenance of the machine

To ensure a long-term quality from the cutting with the CS 401, please follow the maintenance
plan below:
Whole machine
Flange and blade fixing devices
Belt tension
Water hoses and nozzles
Depth screw
Engine housing
Reachable nuts and screws
Adjustment and replacement of the belt
After one hour of work, the belt heats up and stretches. Therefore, you have to re-tighten it.
To adjust the belt, firstly remove the belt guard by unscrewing the 4 nuts. Loose the 4 engine
bolts. Move the motor ( with the tightening screw), to obtain the good belt tensioning (60N by
belt for a displacement of 10mm where the belt is unloaded). Check the alignment of the pulleys
Then tighten the 4 bolts.
To replace the belt, move the engine completely to the front. Adjust the belt and retighten it by
shifting the motor to the rear. Then tighten the 4 bolts.
Lubrication
The CS 401 uses life-lubricated bearings. Therefore, you don't need to lubricate them at all.
Grease the depth screw once a week.
Cleaning of the machine
Your machine will last longer if you clean it thoroughly after each working day.
Regular service period
Perform
at
every
indicated period
Visual control (general
aspect, sealing)
Clean
Clean
Control
Clean
Grease
Clean
Tighten up
CS 401_MAN_EN
19

Advertisement

Table of Contents
loading

This manual is also suitable for:

Clipper cs 401 p97018464762470184647623

Table of Contents