Download Print this page

Southbend EH-10CCH Installation & Operation Manual page 46

Marathoner gold half-size electric convection ovens
Hide thumbs Also See for EH-10CCH:

Advertisement

Troubleshooting
Wiring Diagram for 208/240 Volt Models with Standard Controls
L1
L2
L3
GND
P29
C1
L1
L3
SINGLE PHASE CONNECTION
7
TIMER
TIMER MOTOR
1176416
230 VAC, 50 HZ, (BLUE)
230 VAC, 60 HZ, (BROWN)
8
DOOR SWITCH
1177567
1
SCHEMATIC DIAGRAM
VOLTAGE
240
HEATING
220V
50Hz
ELEMENTS
208
240
MOTOR &
220V
50Hz
CONTROL
208
SOUTHBEND
WIRING DIAGRAM
46
PAGE
OF 76
Marathoner Gold Half-Size Electric Convection Ovens
TB6
P23
BUZZER
1175708
9
16
CENTRIFUGAL SWITCH
P27
P12
TB4
P5
1177540
1177540
COOK
HI
3
LOW
COOL
FAN
FAN SPEED
PHASE LOADING AND LINE AMPERES AS SHOWN
TOTAL
THREE PHASE LOADING
KW
KW PER
L1-L2
PHASE
L2-L3
L1-L3
7.5
2.5
2.5
2.5
6.4
1.91
1.91
1.91
7.5
2.5
2.5
2.5
0.9
0.0
0.0
0.9
0.9
0.0
0.9
0.0
0.9
0.0
0.9
0.0
CONVECTION OVEN E-SERIES 1/2 SIZE
208-240V, 50/60HZ, 2 SPD, 1/2 HP
INSTALLATION & OPERATION MANUAL 1184093 REV 4 (01/23)
C1
22
21
1177566
SHUTDOWN
P25
COOLING FAN
1179794
15
1181996
PROBE
TEMPERATURE
CONTROL BOARD
1181998
4
P10
TB3
P30
P19
P17
HIGH TEMP LIMIT
1161998
1179689
M14
M13
NOMINAL AMPERES PER LINE WIRE
MINIMUM SUPPLY
WIRE (AWG) SIZE
THREE PHASE
SINGLE
PHASE
L1
L3
L2
TOTAL
19
19
19
33
17
17
17
29
21
21
21
36
0.0
3.8
3.8
3.8
0.0
4.1
4.1
4.1
4.3
0.0
4.3
4.3
ELEMENTS
208V ASSY, 1178092
240V ASSY, 1178093
1170425
1177541
FUSE
POWER
41
P6
42
FUSE
P26
P
POTENTIOMETER
V
O
Y
5
4
2
1
3
6
7
8
9
10
11
11
HEAT
A
1170350
HEAT CONTACTOR
C1
P40
P22
1179680
M
W
M24
GND
LEGEND
THREE
SINGLE
PHASE
PHASE
WIRE NUT
8
6
8
6
F/M TERMINAL
8
4
SPADE TERMINAL
TERMINAL STRIP
1177599
TB1
TB2
TB1
TB1
TB1
P/N

Hide quick links:

Advertisement

loading

This manual is also suitable for:

Eh-10scEh-10tcEh-20cchEh-20scEh-20tc