Download Print this page

Southbend EH-10CCH Installation & Operation Manual page 14

Marathoner gold half-size electric convection ovens
Hide thumbs Also See for EH-10CCH:

Advertisement

Installation
Step 4: Installation of Optional Open Storage
The following describes how to assemble the optional open storage. All holes are pre-drilled for the provided screws.
1. Attach the legs to the oven as described in installation Step 2b on page 9.
2. Attach the two rack guides to the bottom of the oven using two clips and four screws for each rack (see figure "A" below).
3. Position the shelf below the rack guides and lift it so that the bottom ends of the rack guides pass through the holes in
the shelf (see figure "B" below)
4. Secure the shelf to the rack guides with four clips, each secured by two screws that thread into the threaded holes on
the shelf (see figure "C" below).
5. Attach the rack-stop using two screws. Attach the top of the rack stop to the bottom of the oven, and the bottom of the
rack stop to the shelf (see figure "D" below).
14
PAGE
OF 76
Marathoner Gold Half-Size Electric Convection Ovens
INSTALLATION & OPERATION MANUAL 1184093 REV 4 (01/23)

Hide quick links:

Advertisement

loading

This manual is also suitable for:

Eh-10scEh-10tcEh-20cchEh-20scEh-20tc