Installation And Connection; Installation; Installation Of Rack - NEC Express5800 Series User Manual

Express server
Hide thumbs Also See for Express5800 Series:
Table of Contents

Advertisement

1. Installation and Connection

This section describes installation and connection.

1.1 Installation

Use the console drawer by installing it on a standard EIA 19-inch rack assembly.

1.1.1 Installation of Rack

Refer to the documentation provided with the rack or contact your service representative for the installation of the
console drawer on the rack.
Express5800 Series 17.3-inch LCD Console Drawer (1port) User's Guide
Be sure to observe the following precautions to use the server and its peripheral devices
safety. Failure to observe the precautions m ay cause death or serious injury. For details,
refer to Safety precautions in Precautions for Use.
・ Do not use the console draw er in any unapproved place.
・ Do not connect the earth w ire to the gas tube.
Be sure to observe the following precautions to use the server and its peripheral devices
safely. Failure to observe the precautions may cause burns, injury, and property damage.
For details, refer to Safety precautions.
・ Do not carry or install the rack assembly only by a single person.
・ Do not install the devices w here the load may be concentrated on a specific point.
・ Do not install any server on the rack only by a single person.
・ Do not pull out a device from the rack if the rack is unstable.
・ Do not leave more than one device being pulled out from the rack.
・ Do not provide the w iring exceeding the rating pow er.
WARNING
CAUTION
49

Advertisement

Table of Contents
loading

This manual is also suitable for:

N8143-122f

Table of Contents