Installation Space Requirements; Mounting - WESTECH Solax X3-HYBRID G4 Manual

Table of Contents

Advertisement

Installation

4.5.3 Installation Space Requirements

Reserve enough space when installing inverter (at least 300mm) for heat
dissipation.
≥300mm
≥300mm
≥300mm
≥300mm
For multi-inverter installation scenarios, the inline installation method is
recommended; when the space is insufficient, the recommended method of
installation in the form of "products"; it is not recommended to install multiple
inverters in stacks. If you choose stack installation, please refer to the installation
separation distance below.
≥300mm
≥300mm
≥1000mm
≥300mm
≥500mm
28
Reserved space dimensions of
installation
Position
Min Distance
Left
300mm
Right
300mm
Up
300mm
Down
500mm
≥300mm
≥300mm
≥300mm
≥1000mm
≥300mm
≥300mm
≥500mm

4.6 Mounting

Preparation
Ø
Please prepare the following tools before installation.
Installation tools: screwdriver, wrench, Φ10 drill, rubber hammer, socket
wrench set and Hexagon keys.
Step 1: Fix the wall bracket to the wall
Ø
First find the expansion screw and the wall bracket in the accessory bag,
as shown below:
It consists of four parts
Expansion bolts, Tapping screws, nut, Gasket
a) Use a marker to mark drilling holes of the bracket on the wall.
b) Drill holes at marked spots with depth of 65mm.
Installation
Bracket
Gasket
29

Advertisement

Table of Contents
loading

Table of Contents