Installation Site Conditions; Installation Carrier Requirements; Installation Requirements - WESTECH Solax X3-HYBRID G4 Manual

Table of Contents

Advertisement

Installation
Tool equipment
Name
Type
Image
Individual
Safety
Protection
gloves
Tool
Type
Image
Name
Equipment
Breaker
Preparation
PV end
wire
EPS
(Off-grid)
end wire
Cable
Preparation
Grid end
wire
Communi-
cation lines
Battery
Cable
PE Cable
26
Image
Name
Safety
shoes
Requirement
Grid port and EPS(Off-grid) port wiring
section (4.5.2)
Dedicated PV wire, line number
#12 AWG withstand voltage 1000V,
temperature resistance 105℃ fire
resistance grade VW-1
Five-core cable
Five-core cable
Twisted pair with shield
Conventional wire
Conventional wire

4.5 Installation Site Conditions

4.5.1 Installation Carrier Requirements

Do not install the inverter near flammable materials.
Please install the inverter on a solid object that can withstand the weight
requirements of the inverter and energy storage system.
Please be careful not to install the inverter in the plasterboard wall or
similar to the residential places with poor sound insulation, so as not to
work with noise and interfere with the residents' life in the morning.

4.5.2 Installation Requirements

Install the inverter at a maximum back tilt of 5 degrees, the inverter can
not be tilted forward, inverted, excessive back tilted or side tilted.
≤5°