Grid Port And Eps(Off-Grid) Output Connection; Eps(Off-Grid) Block Diagram - WESTECH Solax X3-HYBRID G4 Manual

Table of Contents

Advertisement

Electrical Connections

5.2 Grid Port and EPS(Off-grid) Output Connection

X3-Hybrid G4 series inverter are three-phase inverter. Suitable for rated
voltage 380/400/415V, frequency 50/60Hz. Other technical requests should
comply with the requirement of the local public grid.
Ø
Grid port connection
Grid Cable and Micro-breaker recommended
X3-Hybrid-6.0-D X3-Hybrid-8.0-D X3-Hybrid-10.0-D X3-Hybrid-12.0-D X3-Hybrid-15.0-D
X3-Hybrid-5.0-D
Model
X3-Hybrid-5.0-M X3-Hybrid-6.0-M X3-Hybrid-8.0-M X3-Hybrid-10.0-M X3-Hybrid-12.0-M X3-Hybrid-15.0-M
Cable (copper)
4~6mm²
4~6mm²
Micro-Breaker
20A
20A
EPS(Off-grid) Cable and Micro-breaker recommended
X3-Hybrid-5.0-D
X3-Hybrid-6.0-D
Model
Model
X3-Hybrid-5.0-M
X3-Hybrid-6.0-M
4~6mm²
4~6mm²
Cable (copper)
16A
16A
Micro-Breaker
The load should not be directly connected to the inverter.
Figure: Wrong connection of load and inverter
36
4~6mm²
5~6mm²
5~6mm²
5~6mm²
32A
40A
40A
40A
X3-Hybrid-15.0-D
X3-Hybrid-8.0-D
X3-Hybrid-10.0-D
X3-Hybrid-12.0-D
X3-Hybrid-15.0-M
X3-Hybrid-10.0-M
X3-Hybrid-12.0-M
X3-Hybrid-8.0-M
4~6mm²
4~6mm²
4~6mm²
4~6mm²
20A
25A
32A
40A

5.3 EPS(Off-grid) Block Diagram

X3-Hybrid G4 series inverter has an EPS(Off-grid) function. When the
grid is connected, the inverter outputs go through the Grid port, and
when the grid is disconnected, the inverter outputs go through the
EPS(Off-grid) port.
The EPS(Off-grid) function can be connected to part of the load, Please
refer to the following diagram for the wiring.
If you want to save installation time, you will need an accessory. If you
need a solution, please contact our sales staff.
Ø
EPS(Off-grid) wiring diagram
For to different local wiring rules, please refer to the diagram below
Please select the appropriate wiring method according to local wiring
rules.
Diagram A: N line and PE line separate wiring , D series inverters ;
(For most countries)
PV 1
PV 2
X3-Hybrid G4
CT
Breaker
EPS(Off-grid)
BAT
Grid
Breaker
RCD
Battery
EPS(Off-grid) loads
N-BAR for EPS(Off-grid) loads
Electrical Connections
Main Breaker/RCD
N
Grid
E-BAR
Distribution Box
Loads
N-BAR for loads
37

Advertisement

Table of Contents
loading

Table of Contents