DRM requirements:
Requirement
Mode
DRM0
Operation disconnect device
DRM1
Do not consume power
DRM2
Do not consume more than 50% of rated power
Do not consume more than 75% of rated power AND
DRM3
Source reactive power if capable
Increase power consumption
DRM4
(subject to constraints from other active DRMs)
Do not generate power
DRM5
Do not generate more than 50% of rated power
DRM6
Do not generate more than 75% of rated power AND
DRM7
Sink reactive power if capable
Increase power generation
DRM8
(subject to constraints from other active DRMs)
1
1
2
DRM1/5
DRM2/6
DRM3/7
8
Note!
Currently only PIN6 (DRM0) and PIN1 (DRM1/5) are functional, other PIN
functions are under development.
50
3
4
5
6
7
8
DRM4/8
+3.3V
DRM0
GND
GND

5.5.2 Introduction to meter/CT Communication

X3-Hybrid G4 inverter should work with an electric meter or current
sensor (CT for short) to monitor household electricity usage. The electricity
meter or CT can transmit the relevant electricity data to the inverter or
platform, which is convenient for users to read at anytime.
Users can choose to use electric meters or CTs according to their needs.
Please note that the meter/CT brand required by SolaX must be used.
Note!
The meter or CT must be connected to the inverter, otherwise
the inverter will shut down and alarm SolaX "meter failure"alarm.
Smart meters must be authorized by SolaX, third party or
other companies, Unauthorized meter may be incompatible
with the inverter.
SolaX will not be responsible for the impact caused by the use
of other appliances.
Ø
Electric meter connection diagram
Upgrade/Dongle
in
out
L1
L2
L3
N
PE
Household Meter
Meter1
(three-phase meter)
Grid
If the user has other power generation
equipment (such as inverter) at home and
wants to monitor both, X3-Hybrid G4 inverter
provides Meter2 communication function to
monitor the power generation equipment.
For more information, please contact SolaX.
Note: If you want to connect the meter, please ground the GND terminal of the Meter1.
Electrical Connection
com
EPS(Off-grid)
Load
in
out
Other power
Meter2
(three-phase meter)
generation equipment
51

Advertisement

Table of Contents
loading

Table of Contents