Mounting And Installation Of The Base; Battery Modules And Control Module (Bms) Pile Up - Pylontech Force-H1-V2 Operation Manual

Lithium-ion phosphate energy storage system
Table of Contents

Advertisement

3.4.5 Mounting and installation of the base

The base must be fixed installed on the basement with 4pcs M8×80 foundation bolts.
Battery rack basement holes bitmap (unit: mm):

3.4.6 Battery Modules and Control Module (BMS) pile up

Handle above the red marked edgings of the both side of these battery modules and control
module (BMS).
Caution: If hands under this red marked side, hands will get hurt.
23

Advertisement

Table of Contents
loading

Table of Contents