Palm Pre 2 User Manual page 130

Palm pre 2: user guide
Hide thumbs Also See for Pre 2:
Table of Contents

Advertisement

3
Tap
.
4
Enter the task name in the Task name field. To set the task priority, see
Set task priority, due date, and other
Set task priority, due date, and other details
1
Open
Tasks
.
2
Tap the list containing the task.
130
Chapter 7 : Contacts, Calendar, and other personal information
details.
3
Tap
to the right of the task name.
4
Set any of the following:
Priority: High priority tasks appear in red. Normal priority tasks appear
in bold text, and low priority tasks appear in gray text.
List:
Assign the task to a different list.
Due:
Tap
No due
date, and tap a due date option. If you set a due
date, a notification appears at the bottom of the screen on the due
date. Tap the notification to open the task.
5
To enter a note about the task, tap
Notes
and enter the note.

Advertisement

Table of Contents
loading

Table of Contents