Electrical Installation - General Measure Checkweigher User Manual

Hide thumbs Also See for Checkweigher:
Table of Contents

Advertisement

The electric control box can be arbitrarily installed on the left and right sides of the
checkweigher to facilitate the operation of the production process.
2.3

Electrical installation

The power supply is inserted into the three-hole socket with ground or connected to
the power supply equipment such as the electric gas cabinet according to the line mark.
Any wiring and disconnecting operation can only be carried out after power off. After
the operation is completed, check before power on.
2. The serial port is fixed to RS485 communication, where the 485(A) pair should be
connected to 485(A) or 485(+), and the 485(B) pair should be connected to 485(B) or
485(-).
3. The switching quantity input point is valid at low level (DC0V) and does not allow
access to high voltage or alternating current.
4. Switching quantity output point access relay coil for intermediate control, so the
other end of the relay can access DC or AC power supply switching quantity.
5
CW-100G (C01+MCGS)

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Checkweigher and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Cw-100g

Table of Contents