Section 1 – Installation
Unpacking the Instrument
Remove the instrument from the packing crate carefully. The unit comes fully equipped with
all the necessary components and ordered spare parts. Make sure that no parts are lost when
discarding the packing materials. Place the instrument on a firm table, close to the required
service connections.
After the instrument is removed from the shipping crate, the equipment and spare parts
should be checked against the packing list to ensure that all parts have been received and
none are damaged.
Note: File an insurance claim with your freight carrier if damage has occurred
during shipping. Verify all parts shown on the enclosed packing list have been
received. If items are missing, immediately notify Chandler Engineering.
Utilities Required
12VDC @ 6 amps
Tools/Equipment Required
Pipe Wrench
Allen Wrench Set
#2 Phillips Head Screwdriver
Flat Blade Screwdriver
SECTION 1 – INSTALLATION
1-1