Fujitsu Airstage J-IVS AJ 040LCLDH Series Design & Technical Manual page 904

Hide thumbs Also See for Airstage J-IVS AJ 040LCLDH Series:
Table of Contents

Advertisement

¢ Installation restriction and requirement of electricity meter
• Functions that requires installation of electricity meter
To use the following functions, use an electricity meter:
– Electricity charge apportionment
Install for operation using an electricity meter. (Operation without an electricity meter is also pos-
sible.)
When using an electricity meter, an electricity meter must be installed for all the units which per-
form apportionment calculation.
– Peak cut control (Only for System controller)
Installation of an electricity meter is essential.
– Power consumption graph display (Only for System controller)
Installation of an electricity meter is essential.
[Installation example]
Whm
Whm
Electricity meter
2-30. Electricity charge apportionment setting (System controller, Touch panel
controller)
Whm
- (07-158) -
Electricity meter
connection range
Remote controller group
"Units without electricity meter"
Function which uses an electricity
meter can not be used.
2. Function settings

Advertisement

Table of Contents
loading

This manual is also suitable for:

Airstage j-ivs aj 054lcldh seriesAirstage j-ivs aj 045lcldh seriesAirstage j-ivs auxb004glehAirstage j-ivs auxb007glehAirstage j-ivs auxb009glehAirstage j-ivs auxb012gleh ... Show all

Table of Contents