 Installation of Fresh air intake kit
1.
Attach the Fresh air intake kit to the main body using the bolts provided.
2.
Attach the Hook plate by each corner of the Fresh air intake kit. (The attaching screws are at-
tached to the body of the Fresh air intake kit and must be loosened before installing.)
3.
Install the cover.
a. Remover the drain cover attached to the decorative panel and install onto the Fresh air
intake kit.
b. Set the cover in position with screws (2 places) as shown below. Apply the Insulation 4
after installing the cover.
8-4. Fresh air intake kit for Circular flow cassette type and 4-way flow cassette type
Metal fittings
Bolt × 4
Drain cover
Screw × 4
5 to 10 mm
- (10-44) -
DRAIN
PIPE
DRAIN
PIPE
Hook plate
or
Attached
Attached
at UTZ-VXGA
at UTZ-VXRA
Screw
Screw × 4
Insulation 4
Cover
8. Optional parts installation