Fujitsu Airstage J-IVS AJ 040LCLDH Series Design & Technical Manual page 702

Hide thumbs Also See for Airstage J-IVS AJ 040LCLDH Series:
Table of Contents

Advertisement

• Take servicing, etc. into consideration and leave the space as follows.
¢ Installation
CAUTION
• The installation direction can be selected either horizontal (pattern A) or vertical (pattern B), but
keep the inclination within 5°.
– Pattern A
– Pattern B
• Incorrect installation direction or angle may cause improper operation.
• Suspended installation
Remove the 2 screws and replace them with the hanger.
Use hanger bolts to fasten the hanger.
3-2. EV kit
300 mm or more
OUTDOOR
UPWARD
UNIT SIDE
Horizontal installation
Vertical installation
Hanger
Screw
- (06-42) -
Level
Wire
INDOOR
UNIT SIDE
Level
UPWARD
Wire
M10 hanger bolt
(Locally purchased)
M10 nut A
M10 nut B
3. Piping connection

Advertisement

Table of Contents
loading

This manual is also suitable for:

Airstage j-ivs aj 054lcldh seriesAirstage j-ivs aj 045lcldh seriesAirstage j-ivs auxb004glehAirstage j-ivs auxb007glehAirstage j-ivs auxb009glehAirstage j-ivs auxb012gleh ... Show all

Table of Contents