During installation and cable connection, do not step on the front door baffle
plate and the door support at the bottom of the cabinet to prevent paint flake-off
and deformation. Otherwise, the front door will not be properly closed. Do not
step on the top of the cabinet to prevent deformation or collapse.
1.1 Installation Environment and Clearance
Requirements
Installation Environment Requirements
Installation Clearance Requirements
Reserve the following clearances around the cabinet to facilitate operations and
ventilation:
Issue 01 (2022-11-18)

Installation and Cable Connection

CA UTION
Do not install the UPS in a high-temperature, low-temperature, or damp place
that is beyond the technical specifications.
Install the UPS far away from water sources, heat sources, and inflammable
and explosive materials. Keep the UPS free from direct sunlight, dust, volatile
gases, corrosive materials, and salty air.
Do not install the UPS in environments with conductive metal scraps in the
air.
The optimal operating temperatures for valve-regulated lead-acid (VRLA)
batteries are 20–30°C. Operating temperatures higher than 30°C shorten the
battery lifespan, and operating temperatures lower than 20°C reduce the
battery backup time.
Ensure that the floor or installation support can bear the weight of the UPS,
batteries, and battery racks.
If the UPS is equipped with a top outlet kit, do not install devices that are
easy to swing on the top of the UPS. Otherwise, the devices may fall off.