Sealing Cabinets - Huawei UPS5000-H-600 kVA-FTN Quick Manual

Table of Contents

Advertisement

UPS5000-H-600 kVA-FTN
Quick Guide (Singapore, 100 kVA Power Modules)

1.12 Sealing Cabinets

If the unit will not be powered on after installation, take dustproof and anti-
condensation measures (for example, use a dust cover, plastic film, or fabric cloth)
to prevent condensation and dust buildup, which may corrode the unit. Remove
the protective objects when the unit needs to be used.
Step 1 Ensure that all items have been checked after the installation.
Step 2 Fill in gaps between the cables and the cabinets with sealing putty.
1.
2.
Figure 1-70 Filling a gap with sealing putty
(1) Paper protective film
Step 3 Reinstall all covers.
Step 4 Close the cabinet doors.
Do not remove the dust cover from the UPS before power-on.
Issue 01 (2022-11-18)
NO TICE
Remove the paper protective film from the sealing putty and keep the
transparent film.
Fill the gaps between the cables and the cabinets with the sealing putty.
Ensure that the transparent film faces upward.
NO TICE
Copyright © Huawei Digital Power Technologies Co., Ltd.
(2) Transparent film
1 Installation and Cable Connection
(3) Sealing putty (with the
transparent film facing
upward)
55

Advertisement

Table of Contents
loading

Table of Contents