UPS2000-H-(6 kVA–10 kVA)
Quick Guide
1
1.1 Installation Preparations
● A circuit breaker needs to be installed in the upstream of the UPS to facilitate
● The leakage current of the 6 kVA UPS and 10 kVA UPS is less than or equal to
● When UPSs are connected in parallel, the output parallel power cables of each
● Check the lead-acid battery voltage range: Use a multimeter to measure the
● Check the lithium battery voltage range: Hold down the button on the front
1.1.1 Site Planning
Floor Loading Capacity
Ensure that the floor can bear the weight of the UPS and its optional components.
Installation Environment
●
Issue 01 (2022-06-30)
Installation and Cable Connection
NO TICE
maintenance.
50 mA, respectively. When selecting an RCD, consider the leakage current of
the UPS and its downstream loads.
UPS must be at least 1 m long and the length deviation must be less than
±10%. The four cables must be connected at the remote end.
voltage between the positive and negative battery terminals. Voltage range: 9.6
V x Number of batteries to 14.4 V x Number of batteries. For example, if 20
batteries are installed, the voltage between the positive and negative battery
terminals should range from 192 V (20 x 9.6 V) to 288 V (20 x 14.4 V).
panel of the lithium battery for 5 to 10 seconds to power on the lithium battery
for the first time. After the startup wizard is complete on the app (the output
voltage is set to 240 V), use a multimeter to check that the positive and
negative voltages of the lithium battery range from 235 V to 245 V.
Do not install the UPS in a hot, cold, or damp place that is beyond the
technical specifications.
Copyright © Huawei Digital Power Technologies Co., Ltd.
1 Installation and Cable Connection
1