Chapter 3 Hardware Installation; Before Installation - Boser HS-6250 Manual

Celeron / coppermine / tualatin industrial single board computer
Table of Contents

Advertisement

This chapter provides the information on how to install the hardware
using the HS-6250. This chapter also contains information related to
jumper settings of switch, watchdog timer, and the DiskOnChip
address selection etc.
Please be advised that we have upgrade HS-6250 v1.2 to support
Tualatin
CPU by selecting J12. Please refer Jumper Setting
P.12.
Please set CN2 as short 1-2 when using an AT power supply.
3.1

Before Installation

After confirming your package contents, you are now ready to install
your hardware. The following are important reminders and steps to
take before you begin with your installation process.
1. Make sure that all jumper settings match their default settings
and CMOS setup correctly. Refer to the sections on this chapter
for the default settings of each jumper.
2. Go through the connections of all external devices and make
sure that they are installed properly and configured correctly
within the CMOS setup. Refer to the sections on this chapter for
the detailed information on the connectors.
3. Keep the manual and diskette in good condition for future
reference and use.
Chapter 3
Hardware Installation
9

Advertisement

Table of Contents
loading

Table of Contents