Global Ice Bank Control (Gibo) Theory Of Operation; Operation; Equipment Operation Steps - Cornelius Bubble Installation, Operation & Service Manual

Post-mix beverage dispenser
Table of Contents

Advertisement

`

GLOBAL ICE BANK CONTROL (GIBO) THEORY OF OPERATION

Once electrical power is supplied to the Unit, the agitator motor will start. There will be a three-minute time delay before
the refrigeration compressor and the condenser fan motor will start. This three-minute time delay will take place each time
electrical power to the Unit is interrupted. The Unit will continue to operate until ice covers all three stainless-steel pins on
the ice bank control probe. The ice bank control module senses this by measuring the difference in electrical resistance
between the water and the ice. When the ice on the evaporator coil becomes thick enough, it covers the three stainless-
steel pins on the ice bank control probe. The control module senses there is enough ice and turns the refrigeration
compressor and the condenser fan motor off. The Unit remains turned off until the ice bank control three stainless-steel
pins are free of ice. Once this happens, the ice bank control module starts the refrigeration compressor and the condenser
fan motor.

Operation

CAUTION —
Pipe connectors and fasteners for drinking water sources must be measured, installed
and maintained in accordance with local codes.
CAUTION —
The intake pressure of carbon dioxide is 85psi, and the pressure switch is connected.

Equipment operation steps

1. Check whether the water intake connection of the equipment is tight and the position of the water
level probe and the suction pipe is correct, that is, the probe is higher than the suction hole of the
suction pipe; confirm the use of non-pure water; check whether the pressure of carbon dioxide
cylinder is 85psi after decompression of the output pressure; and the pipeline is leak-free; check
whether the power line is connected properly and the power supply is correct; press the main power
switch at the top of the equipment. Check whether the refrigeration system is working properly.
2. When the refrigeration system stops and the ice stops, drinks with different tastes can be sold
normally; drinks with different tastes can be selected according to the valve stickers; the key of this
device is to press the button immediately, press the button, do not let go, the light belt is lit, drinks
are poured out from the outlet and into the cup; when it is full, the key is loosened and the cup is
finished;
14
© 2019, Cornelius Inc

Advertisement

Table of Contents
loading

Table of Contents