Task Life Cycle; Figure 39: Task Life Cycle; Figure 40: Following Task Example; Figure 41: Edit Button - Safran SATCORE Series User Manual

Table of Contents

Advertisement

SATCORE SERIES
USER's MANUAL

3.3.2.4 Task life cycle

When a task is created, the Satcore web application automatically performs each step of the task life cycle.
Following task
This task life cycle is completed by the error task status. This status appears when the task encounters a problem.
3.3.2.4.1 F
OLLOWING TASK
When the user has created a new task, the task will be displayed on the top of the task list.
This following task will have as status the time remaining until the execution of the task.
The following tasks can be identified by a header with a light grey background color.
3.3.2.4.2 E
DIT TASK
Note that the user can edit a task when it has not been processed. the user will be able to change the
configuration file, the task name, the starting and ending date of the task.
ZODIAC DATA SYSTEMS PROPRIETARY
ZDS Ref :
Task
running

Figure 39: Task life cycle

Figure 40: Following task example

Figure 41: Edit button

D102751
Issue : 1
Date : July 11, 2019
Task
achieved
Rev.: 0
Page 65

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents