Download Print this page

Krick 20320 Building Instructions page 31

Lisa m.
Hide thumbs Also See for 20320:

Advertisement

Available languages

Available languages

52
After this fit the hand rail 52.
5. Roof and Flybridge
The last step for the superstructure starts with
gluing the main roof (36) on top.
36
Then the Flybridge will be built with parts 41,
42, 43, 44, 45 and 46.
44
43
46
44
First the parts 41 and 42 will be glued together.
Place strips 3 x 5 x 40 mm for strengthening.
Strip 3x5 mm
Stand Februar 2016
41
42 45
41
Seite 9
42
Now place dashboard (45) and glue.
45
Then place the flybridge on the top of the roof,
check alignment and fix with superglue.
To match the curve of part 42 to the curve of
the roof, you can place sand paper flat onto the
roof and sand the wall to have a better fit, if
necessary.
Now place the false edge (46) and glue to the
roof.
46
©
Krick Modelltechnik Knittlingen

Advertisement

loading