STEP 2: (CAB INSTALLATION)
2.28 Per Figures 2.28a and b, run compressor part of
the AC wire harness (ring and push-on terminals)
to the compressor. Remove 3/8" Lock Nut and
install ground ring terminal. Re-install 3/8" Lock
Nut and connect the push-on terminal to terminal
found on the compressor. Use supplied Wire Ties
as need.
Hardware Used
11" Heavy Duty Wire Ties
Tools required
9/16" wrench or socket
5/16" allen wrench
Angle Wire Cutters
2.29 Pass the AC Wire Harness between the Radiator
and right R.O.P.S as shown in Figure 2.28a.
Continue to run the harness down the inside of the
right fender. Connecting the harness' 2-pin
connector to the vehicle harness per Figure 2.29.
Use supplied Wire Ties as needed.
Hardware Used
11" Heavy Duty Wire Ties
Tools required
Angle Wire Cutters
2.30 Run the harness (fuse holder side) to the Positive
Terminal on the Vehicle's battery per Figure
2.30a. Next, run the black wire ring terminal to the
disconnected battery wire and install onto the
ground lug. Reconnect lug onto the battery per
Figure 2.30b.
Hardware Used
11" Heavy Duty Wire Ties
Tools required
1/2" wrench or socket
Angle Wire Cutters
Reconnect
Fig. 2.30b (Run Harness to (-) Terminal on Battery)
CAB INSTALLATION
Qty
As Needed
Qty
As Needed
Qty
As Needed
Fig. 2.28a (Routing AC Wire Harness)
Connect Push-
Fig. 2.28b (Connecting AC Harness to Compressor)
2-Pin Connector
Signal Wire
for Optional
Console
Fig. 2.29 (Run Harness on Inside of Right Fender)
Fuse Holder
Ring Terminal
Fig. 2.30a (Run Harness to (+) Terminal on Battery)
21 of 34
Harness to
Battery
Harness to
Compressor
Install
Ground Here
On Here

Advertisement