Download Print this page

Curtis 1JDZ994RPR Installation & Owner's Manual page 18

For john deere z994r

Advertisement

STEP 2: (CAB INSTALLATION)
2.21 Slide the supplied right hand drive handle boot
down over the drive handles. (The right filler does
not have the hole shown in Figure 2.22)
Press the sewn on foam into the gap between the
frame and fender and attach the boot to the pre-
installed Velcro.
Move the drive handle forward and backwards as
well as left to right to determine best spot for
locating Velcro onto drive handles that will secure
the top edge of the boot and mark the top edge at
the appropriate location. See Figure 2.21.
Slide the boot down the handle and apply Velcro
around the handle below the mark.
Secure the top of the boot to the Velcro.
Tools required
Scissors
Marker
2.22 Repeat installation for the left boot.
Slide the hole in the left boot over the head of the
adjustment bolt as shown in Figure 2.22 upon
installation.
Tools required
Scissors
Marker
CAB INSTALLATION
Mark for Velcro
Fig. 2.21 (Loosely Install Drive Handle Filler, Right)
Bolt on Left
Side Only
Fig. 2.22 (Install Left Filler, Outside)
18 of 34
Foam Goes
Here
Foam Goes
Here

Advertisement

loading