STEP 2: (CAB INSTALLATION)
2.26 Secure the larger AC hose and the wire harness
to the ROPS brackets using p-clamps as shown in
Figure 2.26.
Adjust hose and clamps so that the hoses are
away from the hot muffler when p-clamps are
tightened.
Hardware Used
1/4-20X1" Button Head Screw
1/4-20 Flange Lock Nut
3/4" P-Clamp
11" Heavy Duty Wire Ties
Tools required
5/32" allen wrench
7/16" wrench or socket
Angle Wire Cutters
2.27 Run drain hose for AC Unit down in front of the
alternator and out the bottom of the vehicle. Keep
hose away from moving components and hot
engine parts. See Figures 2.27a, b, and c for
routing recommendations. Use provided Wire
Ties as needed.
Hardware Used
11" Heavy Duty Wire Ties
Tools required
Angle Wire Cutters
Drain Hose
Fig. 2.27c (Drain Hose at Bottom of Vehicle)
CAB INSTALLATION
Qty
3
3
3
As Needed
Qty
As Needed
Hose Clamps
Fig. 2.26 (Install Hose Clamps on R.O.P.S Brackets)
Run Drain Hose
Down Here
Fig. 2.27a (Routing Drain Hose)
Drain Hose
Fig. 2.27b (Drain Hose Between Radiator and R.O.P.S.)