Juniper EX9253 Hardware Manual page 58

Hide thumbs Also See for EX9253:
Table of Contents

Advertisement

Table 22: Site Preparation Checklist
Item or Task
Plan rack or cabinet location, ensuring the
required space clearances.
Secure the rack or cabinet to the floor
and building structure.
Cables
Plan the cable routing and management.
Acquire cables and connectors:
Determine the number of cables
needed based on your planned
configuration.
Ensure that the distance between
hardware components to be
connected allows for cable lengths to
be within the specified maximum
limits.
RELATED DOCUMENTATION
General Safety Guidelines and Warnings
Installing and Connecting an EX9253 Switch | 77
(Continued)
For More Information
"Clearance Requirements for
Airflow and Hardware
Maintenance for an EX9253
Switch" on page 53
"Rack and Cabinet Requirements
for EX9253 Switches" on page
54
Performed by
Date
49

Advertisement

Table of Contents
loading

Table of Contents