Installation

Controller Power

Before applying power to the controller, check the wire terminations at each terminal
block for any loose wires and verify that the 24VAC power wiring at terminal J1 is
correct. The transformer secondary, wired to G0, must be connected to earth ground. Using a
supply voltage other than specified may cause damage to the controller.