Quick Start Checklist
Verify controller Power
Expected value: 24 VAC ±15%
Measured Value:
Comments:
Relocate & Calibrate Supply Temperature Sensor
Measured Value:
Controller Value:
Supply Temperature Sensor Offset Entered:
Comments:
Calibrate Outdoor Humidity
Outdoor Humidity Required Yes No
Measured Value:
Controller Value:
Outdoor Humidity Sensor Offset Entered:
Comments:
Install & Calibrate Space CO2
Space CO2 Sensor Required Yes No
Measured Value:
Controller Value:
Space CO2 Sensor Offset Entered:
Comments:
Configure Time Schedule
Comments:
Modify TCP/IP Settings Per Site Requirements
DHCP: Enabled Disabled
IP Address:
Subnet Mask:
Default Gateway:
DNS:
Comments:
Perform Air Balance Using Force Vent Mode
Blower Speeds:
Minimum Economizer Positions/CFM:
Vent:
Vent:
Cooling Low:
Cooling Low:
Cooling High:
Cooling High:
Heating Low:
Heating Low:
Heating High:
Heating High:
Enter Set-points to Comply With Site Requirements
Temperature/Humidity Set-points
Timers/Delays
Comments:
DAIKIN ILINQ QUICK START GUIDE
Install Space Temperature Sensor
Measured Value:
Controller Value:
Space Temperature Sensor Offset Entered:
Comments:
Install & Calibrate Space Humidity
Outdoor Humidity Sensor Required Yes No
Measured Value:
Controller Value:
Space Humidity Sensor Offset Entered:
Comments:
Calibrate Outdoor Temperature
Measured Value:
Controller Value:
Outdoor Temperature Sensor Offset Entered:
Comments:
Configure Date/Time
Controller Time:
Controller Timezone:
Comments:
Verify Unit Configuration
Comments:
Modify BACnet
®
Settings Per Site Requirements
BACnet Communication: Required Not Required
Communication Type: MS/TP IP
Instance ID:
Baud Rate:
MAC Address:
Max Master:
Comments:
DCV Minimum Economizer Positions/CFM:
Vent:
Cooling Low:
Cooling High:
Heating Low:
Heating High:
Create Site Parameter Export File Once Controller
Configuration is Finalized
Export File Name:
Comments:
25
Need help?
Do you have a question about the iLINQ and is the answer not in the manual?