2B-3 Power Trim and Tilt:
Installation
Installation is reverse order of removal with special
attention to the following steps.
• Lower tilt rod to full down position.
• Apply water resistant grease to the tilt cylinder lower
shaft and lower shaft bushing.
Install the lower shaft bushing (1) and cylinder lower
shaft (2) to PTT unit. Install the spacer (3) to cylinder
lower shaft.
: Grease 99000–25161 (SUZUKI Water
Resistant Grease (250 g))
1
• Place PTT unit in position between the clamp
brackets.
• Tighten clamp bracket shaft nut (4) to specified
• After tightening clamp bracket shaft nut to specified
3
2
• Tighten cylinder lower shaft bolts (5), pre-coated with
IBJ611220007-02
IBJ611220008-01
torque.
Tightening torque
Clamp bracket shaft nut (a): 43 N·m (4.3 kgf-m,
31.0 lbf-ft)
torque, bend lock washer edge toward nut to secure
nut.
4
(a)
thread lock, to specified torque.
: Thread lock cement 99000–32050 (SUZUKI
Thread Lock 1342 (50 g))
Tightening torque
Cylinder lower shaft bolt (b): 50 N·m (5.0 kgf-m,
36.0 lbf-ft)
5
(b)
IBJ611220009-01
5
(b)
IBJ611220010-01