GeoVision V6 User Manual page 31

Gv-hot swap surveillance system
Table of Contents

Advertisement

Getting Started
3
3.
Install the sliding rails onto the server rack, and secure the front and rear with screws.
4.
Pull out the middle part of the rails, align the inner rails onto the chassis, and slide the
chassis into the server tack until the quick-release handle on the ear kit snaps into place
with the server rack.
21

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gv-nvrh v6Gv-vmsh v6Gv-vmsh pro

Table of Contents