GeoVision V6 User Manual page 28

Gv-hot swap surveillance system
Table of Contents

Advertisement

3.
Insert the stag into the upper and lower square holes on EIA rail from the back of rail.
Push the safety lock forward to secure the bracket. Make sure to check if the safety lock
is in unlocked position before mounting the brackets.
18

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gv-nvrh v6Gv-vmsh v6Gv-vmsh pro

Table of Contents