Preparing The System For Operation - Hitachi CHROMASTER 5160 Instruction Manual

Table of Contents

Advertisement

4.1.2 Preparing the System for Operation

Waste bottle
(1)
Fig. 4-1 shows how to connect the units for performance
check. According to this figure, carry out tubing.
Before energizing the system, ensure that the tubing
between the autosampler and pump/detector is properly
connected.
Detector
Autosampler
Pump
Fig. 4-1 Flow Path Diagram
(2)
Connect the e-Line cable among the autosampler, detector
and pump.
(3)
Check if the drain tube is properly connected to the waste
solution bottle. The waste solution bottle must be at a
lower position than the autosampler.
4 - 2
Load resistance coil
(Injection valve)
(Syringe valve)
Mobile
Wash
phase
liquid

Advertisement

Table of Contents
loading

Table of Contents