Emerson ASTEC Helios Candeo AP6C75AA Installation Manual page 8

Table of Contents

Advertisement

8 Contents
3.5.1.
3.5.2.
3.5.3.
3.5.4.
3.6. Securing adjacent frames............................................................................................ 31
3.8. Top support................................................................................................................. 35
3.9. Installation of frame earthquake bracing kit(s)............................................................. 36
3.10. Module installation ...................................................................................................... 37
4.
4.1. General ....................................................................................................................... 39
4.1.1.
4.1.2.
4.1.3.
4.1.4.
4.2. Cabling and connecting the grounding leads ................................................................ 45
4.2.1.
4.2.2.
4.3. Cabling and connecting the AC supplies for the rectifiers ............................................ 49
4.3.1.
4.3.2.
4.4. DC cabling and connecting .......................................................................................... 54
4.4.1.
4.5. Miscellaneous cabling and connecting ......................................................................... 62
4.5.1.
4.5.2.
4.5.3.
4.5.4.
4.5.5.
4.5.6.
4.6. Final connections at the batteries................................................................................ 70
5.
5.1. General ....................................................................................................................... 73
5.2. Voltage levels.............................................................................................................. 73
5.3. Installation of the rectifiers on the frame(s)................................................................. 73
5.4. Initial start-up, testing and adjustment of the system.................................................. 75
IM6C75AA P0914426 Standard 3.00 March 2001
Standard anchoring in a concrete floor ........................................................... 27
Wood floor...................................................................................................... 28
Earthquake anchoring..................................................................................... 29
Raised floor.................................................................................................... 30
Basic ruling .................................................................................................... 39
Connecting lugs.............................................................................................. 40
Torque values for bolted connections ............................................................. 43
Cabling layout ................................................................................................ 43
Segregation from AC cables ........................................................................... 55
4.4.1.2. Connecting the DC load cables.................................................................. 56
Connecting the Remote Sense leads to the batteries ...................................... 65
Connecting the alarms to the office alarm circuit............................................ 66
Installing and connecting the temperature probes........................................... 67
Connecting of the interframe data link cable(s)............................................... 69
Connecting the uninterrupted DC supply leads................................................ 69
Connections at the communication ports ........................................................ 70
39
73

Advertisement

Table of Contents
loading

Table of Contents