36 Locating and erecting the cabinets
Figure 3.14 – Typical top support group for standard frames
Shown without the cable rack for clarity
A
Auxiliary framing
A
Note:
ceiling or walls and that the site requires ISG grounding topology, then top
isolation hardware must always be used along with the top supporting
hardware (see section 3.1.1.2 and Figure 3.15),
Figure 3.15 – Special support group for isolated applications
Side view of
top of frame
3.9.

Installation of frame earthquake bracing kit(s)

If the installation is seismic qualified, install the optional earthquake bracing
kit(s) provided for the frame(s) of your AP6C75AA Helios Candeo power
system as shown in the following illustration.
Note 1:
earthquake bracing kit(s).
Note 2:
(System Manager, rectifiers, Distribution Modules, etc.) must be filled with
blank panels in order to maintain the seismic qualification of the system.
IM6C75AA P0914426 Standard 3.00 March 2001
Front view
Frame channel
upright
If the installation is attached to an overhead structure attached to the
A
A
It may be necessary to remove some modules to install the
All positions that are not occupied by equipment on the frame
Interframe link
plate if two or
more frames
are provided
A0802264
5" wraparound
isolating sheet
(one per channel)
Cable rack
Front
VIEW A - A
VIEW A - A