58 Cabling and connecting
Figure 4.10 – Cabling and connecting inside a Distribution 500 module
5/8" c-c spacing
(1" for double clip)
Method of
connecting
loads to load
clips inside
distribution
modules
5/8" wide tongue
(1-1/4" for double clip)
Installation and wiring of a GMT 0-10 A
distribution fuse module
IM6C75AA P0914426 Standard 3.00 March 2001
Insert load clip into
distribution module
as shown
Use angle bracket
on BR busbar for
lugs over 2/0
(see Figure 4.13)
Single position
load clip for
loads
under
65 A
Method of inserting circuit breaker into Distribution Module
Set J2 jumper for standard (bottom position) or mid trip (top position)
alarm as required (see
Typical layout of the load cables inside a Distribution Module
Dual position
load clip
for loads
65 A or
more
Figure 4.12
).