Emerson ASTEC Helios Candeo AP6C75AA Installation Manual page 11

Table of Contents

Advertisement

List of Procedures
Procedure 3.1 - Marking the floor for the anchor positions....................................................... 22
Procedure 3.3 - Drilling for the anchor positions in a wood floor .............................................. 24
earthquake applications) ............................................................................................. 27
Procedure 3.7 - Securing the frame(s) to a wood floor ............................................................. 28
Procedure 3.9 - Installing the interframe DC link bar between adjacent frames DC
backbones................................................................................................................... 32
Procedure 4.5 - Connecting the distribution loads .................................................................... 61
Procedure 4.6 - Installing and connecting the Remote Sense leads........................................... 65
Procedure 4.7 - Installing and connecting the temperature probes............................................ 67
Procedure 5.1 - Inserting the rectifiers in the frame ................................................................. 75
Procedure 6.1 - Installing the doorframe .................................................................................. 80
Helios Candeo Power System - AP6C75AA Installation Manual
Contents 11

Advertisement

Table of Contents
loading

Table of Contents