Hardware Installation - Emerson PACSystems RX3i Quick Start Manual

Hide thumbs Also See for PACSystems RX3i:
Table of Contents

Advertisement

Quick Start Guide
Chapter 2
GFK-2939A
Sep 2019

2. Hardware Installation

The ACC402 Energy Pack may be mounted on a standard
EN50022 DIN rail or directly on an equipment panel. It is
designed to be mounted adjacent to the CPE330
Controller and connected to the Controller using the 1m
cable provided (IC695CBL002).
Heat dissipation: A minimum clearance of 25mm (1 inch)
needs to be provided on all four sides of the unit (right,
left, top and bottom).
Hardware Installation
5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pacsystems ic695acc402

Table of Contents