Lan Cable; Active Power Increase; Dip Switch Settings - Webasto Next Operating And Installation Instructions

Table of Contents

Advertisement

4.
Then remove the screwdriver again and perform a tension
test to ensure that the individual wires are clamped prop-
erly and fully and no exposed copper areas are visible.
NOTE
If multiple charging stations are connected to a com-
mon main power supply point, there is a risk of over-
load.
A phase rotation must be provided and adapted to
the connection configuration of the charging stations.
See online configuration instructions:
https://charging.webasto.com/int/products/docu-
mentation
5.
Insert the data line into the designated connection in the
connection area. See chapter 4.2.4, "Control cable (Control
Pilot)" on page 6 and Fig. 3.
6.
Remove any soiling such as insulation trimmings out of the
connection area.
7.
Check again for firm attachment of all wires in the corres-
ponding terminal.
8.
Next position the cable bushing in the housing lead-
through.
NOTE
Make sure there are no air gaps between the housing
and the cable bushing.
8.4.1
The electrical connection in split-phase
systems
Terminal configuration:
Supply lead
L1
L2
Table 2: Terminal configuration
DIP switch configuration: D6 = 0 (OFF)
NOTE
This terminal configuration does not define the unbal-
ance load limit.
NOTE
Supply lead: a maximum of 230 V rated voltage is per-
mitted between L1 and L2.
8.5

LAN cable

For connecting the charging station to the network infrastruc-
ture at the installation location. The charging station can be
configured and controlled using this connection (prerequisite:
connection to the back end or to the local energy management
system). A CAT 7 network cable is recommended. The LAN
cable must be passed through the left-hand opening in the wall
box in order to connect it to the LAN socket.
8.6

Active power increase

4
3
2
1
Fig. 9
5111232C OI-II Webasto Next_EN
Terminal block
L1
Neutral
Installation and electrical connection | 8
The active power control as per the rules of VDE AR-4100
should be connected as follows:
The two cables from the ripple control receiver or the floating
contact must be connected to this connector in positions 3 and
4 (see Fig. 9). The two cables can be assigned to pos. 3 and 4 in
any order (sequence). (max. cable cross section 1.5 mm²).
WARNING
No voltage should be applied between terminals 3 and
4.
8.7

DIP switch settings

DANGER
High voltages.
u
Danger of fatal electric shock.
u
Ensure safe isolation from the power supply.
DIP switches determine the maximum current. The current can
be adjusted in 1 A increments using the Charger Setup app up
to the maximum value that is configured by the DIP switches.
ON (1)
Fig. 10
DIP switch left/ON = 1
DIP switch right/OFF = 0
DIP-switch factory setting:
D1
D2
Off
Off
NOTE
Changes to the DIP switch settings become active after
restarting the charging station.
D1 D2 D3
[A]
0
0
0
32
Factory settings
0
0
1
10
0
1
0
13
0
1
1
16
1
0
0
20
1
0
1
25
1
1
0
8
1
1
1
0
Demo mode: charging not possible
OFF (0)
D3
D4
D5
Off
On
On
Description
D6
On
11 / 23