Adjusting The Height Of Sequin Device; Adjusting The Sequin Feed Timing; Changing The Sequin Guide - KANSAI SPECIAL LX-SP Series Instructions Manual

Industrial sewing machines
Table of Contents

Advertisement

4-3 Adjusting the height of sequin device

※Height will be changed depending on the fabric
weight.
1.
Loosen screw E on the figure. (Fig.21)
2.
Move the sequin device up or down.
3.
Clearance range between the bottom surface of
sequin device and the top surface of the needle
plate should be 1.5~2.0mm. (Fig.23)

4-4 Adjusting the sequin feed timing

■  P roper timing is the moment which a sequin starts to be fed, when the point of needle
reaches 0.5~1.0 mm above from the sequin surface on its upstroke. (Fig.25)
■  T urn on the power, and check the sequin feed timing by turning the hand pulley slowly.
■  L oosen screws A, and adjust the synchronization by turning round the magnet-attached
pulley. (Fig.24)

4-5 Changing the sequin guide

■  T he sequin guide size shall be fit sequin size itself. (Fig.26)
1.
Take away screws, and change the sequin guide.
2.
Insert the sequin tape into a sequin guide, and then adjust the guide position that the
center of sequin hole and position mark on the sequin device are placed on collinear
position.
3.
When the sequin size changes, the sequin cutting position and the needle drop down
position will be also change. In case of its situations, please check back to "4-1 & 4-2."
※Please also change the presser foot for same-sized sequin.
(Fig.24)
8
(Fig.23)
(Fig.25)
(Fig.26)
-
-
s
e
r
s
e
r
i
e
s
i
e
s

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lx5801sp

Table of Contents