Connecting The Electric Cord; Checking The Sequin Feed Timing - KANSAI SPECIAL LX-SP Series Instructions Manual

Industrial sewing machines
Table of Contents

Advertisement

3-4 Connecting the electric cord

■  C onnect the electric cord as the following figure. (Fig.12)

3-5 Checking the sequin feed timing

■  P roper timing is the moment which a sequin starts
to be fed, when the point of needle reaches
0.5~1.0mm above from the sequin surface on its
upstroke. (Fig.13)
■  T urn on the power, and check the sequin feed timing
by turning the hand pulley slowly.
■  I f the feed timing is incorrect, need to be adjusted.
Refer to "4-4 Adjusting the sequin feed timing" on
page. 8.
4
(Fig.12)
(Fig.13)
-
-
s
s
e
r
i
e
s
e
r
i
e
s

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lx5801sp

Table of Contents