Installation Of Outlet Valves (Option); [A] Checks Before Installation; [B] Location - Hoshizaki ROX-20TA-U Instruction Manual

Water electrolyzer
Hide thumbs Also See for ROX-20TA-U:
Table of Contents

Advertisement

6) Remove two blind bushings from the unit base and attach the cables to the unit base using
the bushings attached to the Float Switch. See Fig. 14.
Note: Use one bushing for 2 cables.
7) Replace the Rear Panel in the original position with screws.
White
Connector
Cable
Bushing

8. INSTALLATION OF OUTLET VALVES (OPTION)

[a] CHECKS BEFORE INSTALLATION

1) Unpack and remove shipping carton, tape(s) and other packaging material(s).
2) Check that all the necessary accessories are included.

[b] LOCATION

1. This outlet valve is not intended for outdoor use. Normal operating ambient
temperature should be within +40°F to 95°F (+5°C to +35°C); Normal operating
water temperature should be within +40°F to 85°F (+5°C to +30°C). Operation
of the outlet valve for extended periods outside of these normal temperature
Black
Connector
Fig. 12
Fig. 14
Terminal Block
Base
WARNING
20
Fig. 13

Advertisement

Table of Contents
loading

Table of Contents