There are 3 LED indicators on the front panel which indicate the operational state of the rectifier:
Red LED
Yellow LED
Green LED
6
I
NSTALLATION
WARNING
installation. The system must be completely de-powered.
All circuit breakers in a NewMar power system must be in their OFF position prior to installation.
WARNING Use extreme care when fitting batteries & their connections. Remove all
conductive materials from yourself such as watches, jewelry and rings prior to
WARNING Use extreme care when fitting solar panel connections. DO NOT short
terminals when working on them.
CAUTION
The energy manager contains static sensitive components that require careful
handling and proper precautions to be taken. A grounding strap should be worn.
6.1

Required Tools

Insulated M6 or ¼", M8 or 5/16" pozi Screwdriver, insulated 0.6mm x 2.5mm diameter flat head screwdriver,
Insulated M10 or 3/8" bolt wrench/ratchet set and as required depending on set up available.
6.2

Suitable Racks

NewMar Power System Manual
Model: COMMANDER II AND COMMANDER II+
Urgent alarm state.
Non-Urgent alarm.
DC power is connected to the unit.
This LED flashes during power save mode.
All upstream AC, Load and Battery breakers must be switched OFF prior to
commencing the installation. DO NOT short terminals when working on them.
Avoid resting cables on sharp edges (cold-creep)
M-CMDRII 063022
Page 11 of 43
Version 1.0