Appendix 3 Installation Of Ac Junction Box - NewMar Centurion II Installation & Operation Manual

-48vdc and +24vdc
Hide thumbs Also See for Centurion II:
Table of Contents

Advertisement

A
3 –
PPENDIX
Cable Tie
Mount
Supplied Cable Clamps
2 x 3 /8" NM Cable Clamp
1 x 3/4" NM Cable Clamp
1. The above illustration shows the rear and side of the AC junction box.
2. To remove the junction box cover, loosen the four screws located at the top of the AC junction
box.
3. Loosen cable clamp screws and route AC cables though cable clamps. Connect AC cables to AC
input terminal block. (See Centurion II Input wiring options (M-C2ACOPT) drawings for wiring
options)
4. Tighten cable clamp screws and confirm the cables are firmly secured.
5. Re-install top cover and tighten screws.
INSTALLATION OF AC Junction Box
Newmar • 1580 Sunflower Ave, Suite 100, Costa Mesa, CA 92626
Phone: 714-751-0488 • E-mail: techservice@Newmarpower.com
Loosen Screws to Remove Cover x 4
AC Junction Box
( Right Rear)
29
Centurion II
Rectifier Shelf

Advertisement

Table of Contents
loading

This manual is also suitable for:

C2rs

Table of Contents