Download Print this page

OLT CLA128-SLIDER-METAL-ES Assembly Manual page 8

Classic 12x8 shed - sliding doors - es

Advertisement

2.
When correctly positioned, attach each Joist with 4 - 2 1/2" screws (2 per end). You can find the
Square Drive Screw Bit in the Hardware Kit Bag.
3.
Lay out Floor Joist Frames as illustrated.
There are 3 larger and 3 smaller Frame Sections.
The Footprint for the floor when attached together
will be 136 1/2" wide x 96" deep.
5.
Complete all large and small frame
attachments. Screw each completed section
together with 8 - 2 1/2" Screws.
Toll Free 1-888-658-1658
You
can
find
Square Drive Bit for
the screws in with the
Hardware Kit Bag.
6.
should be 136 1/2" wide x 96" deep.
www.outdoorlivingtoday.com
Page 8
the
4.
Attach each large and small floor joist
frame together with 6 - 2 1/2" Screws per
section.
96"
136 1/2"
When completed, your floor footprint
sales@outdoorlivingtoday.com

Advertisement

loading