Download Print this page

OLT CLA128-SLIDER-METAL-ES Assembly Manual page 29

Classic 12x8 shed - sliding doors - es

Advertisement

Important: Remove Metal
Roof Hangers
49.
Before fully fastening Metal Roof Panels down, remove the Metal
Roof Hangers and insert Foam Enclosures between Metal Roof
Panels and Battens at the bottom of the roof. Enclosures will prevent
moisture and unwanted bugs, etc from entering your shed through here.
50.
Using 12 - 2" Metal Screws and 1/4" Nut Driver, secure Metal
Roof Panels down to lower 2 rows of Battens. Leave the top row unse-
cured for now to secure Ridge Cap later in Step 53. Tighten screws in
middle row that were partially secured in Step 48. Do not overtighten!
51.
Repeat Steps 45 - 50 to complete opposite side of Metal Roof.
Toll Free 1-888-658-1658
www.outdoorlivingtoday.com
Page 29
Parts (Step 49)
Foam Enclosures
(Several Pcs)
Screw into center of
Battens.
Hardware (Step 50)
2" - Metal Roof Screws
x 12 total
sales@outdoorlivingtoday.com

Advertisement

loading