Start-Up - Trane Symbio 800 Control Upgrade Kit Installation Instructions Manual

For tracer ch530/ch531 dynaview display
Table of Contents

Advertisement

Start-Up

1. When the programming is completed and saved, shut
down power to the control panel and disconnect the
USB cable from the door of the control panel.
2. Reconnect the wire removed from the J2-1 on the 1A13
LLID.
3. Restore power to the control panel.
The chiller is now ready for normal startup and
checkout procedures.
If you have further questions, contact Trane Global Parts
Technical Services. To contact them, send a message to
ATechnicalService@trane.com.
CDUB-SVN001B-EN
31

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Symbio 800 Control Upgrade Kit and is the answer not in the manual?

Table of Contents