Commissioning; Function Check; Switching On The Measuring Device - Endress+Hauser Levelflex M FMP45 Operating Instructions Manual

Guided level-radar hart/4...20 ma
Hide thumbs Also See for Levelflex M FMP45:
Table of Contents

Advertisement

Commissioning

ENDRESS + HAUSER
+
E
42
6
Commissioning
6.1

Function check

Make sure that all final checks have been completed before you start up your measuring point:
• Checklist "Post-installation check" (→ ä 25).
• Checklist "Post-connection check" (→ ä 25).
6.2

Switching on the measuring device

When the instrument is switched on for the first time, the following messages appear on the display:
Levelflex M FMP45 with HART/4...20 mA
After 5 s, the following message appears
After 5 s, the following message appears (e.g. on HART
devices)
After 5 s or after you have pressed
message appears
Select the language
(this message appears the first time the instrument is
switched on)
Select the basic unit
(this message appears the first time the instrument is
switched on)
The current measured value is displayed
F
After
is pressed, you reach the group selection.
This selection enables you to perform the basic setup
F
the following
Endress + Hauser

Advertisement

Table of Contents
loading

Table of Contents